Optimal placement of PMU for complete observability of the interconnected power network considering zero-injection bus: A numerical approach

Rohit Babu, Biplab Bhattacharyya

Abstract


This paper presents an approach to place the phasor measurement unit (PMU)optimally, which minimizes the setup cost of PMU. This methodology attains complete state estimation of the interconnected power networks. An integer linear programming (ILP) method is explored for the optimal PMU placement problem. It is used to determine the optimal location and minimum number of PMUs necessary to make the interconnected power network completely observable. ILP may provide many solutions if acquainting buses to zero injection buses are unhandled. In the case of more than one solution, a bus observability redundancy index and total system observability redundancy index is proposed to find the most promising solutions set for redundancy measurement. The proposed algorithm is applied to benchmark the optimal PMU placement solutions for the IEEE 14-bus, IEEE 30-bus, New England 39-bus, IEEE 118-bus, and NRPG 246-bus test systems. The obtained results of the proposed approach are compared with the existing standard algorithm, and it is observed that the proposed approach achieves complete observability of the interconnected power network under base-load conditions.

Full Text:

PDF


DOI: http://doi.org/10.11591/ijape.v9.i2.pp135-146

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

International Journal of Applied Power Engineering (IJAPE)
p-ISSN 2252-8792, e-ISSN 2722-2624

Web Analytics Made Easy - StatCounter IJAPE Visitors